Definitely rotate racks vertically around the 7-8 hour mark or so. Wrap when you have great colored/textured bark, then take them up to 200. If it was me I would stick a wired probe with alarm in the smaller butt on both top and bottom racks. When they're done put the 2 remaining butts on top rack and go till finished. Should be great!