Put some blue painters tape over the holes on the inside of the bowl. Buy some high heat JB Weld then fill the holes from the outside of the bowl. Once dry, pull off the tape and the ash sweeps should move over the repaired area with no issues. If they do catch at all on the repaired areas, you can sand down any high spots of the JB Weld.